FiltaPave® Specifications
Contact FPP Industries today and speak to our team to find out more about the specifications for FiltaPave®, our innovative asphalt alternative product.
Notes
If the sub-base has clean soil with good infiltration properties, then the use of porous pavement may reduce number and size of pits, as well as reducing size of storm water pipes. This will be determined by hydraulic design, where underdrain of crushed concrete acts as a reservoir.
The City of Sydney require ‘Blue Metal’ aggregate to replace crushed concrete when tree roots are present.
The FiltaPave® binder is very fast curing binder and will cure within 24 hours. As a result, it gives a very early handover to the client. Product will be inert, which means that other products will not affect it after 24 hours. FiltaPave® is not suited to main roads.